JavaScript is disabled in your web browser or browser is too old to support JavaScript. Today almost all web pages contain JavaScript, a scripting programming language that runs on visitor's web browser. It makes web pages functional for specific purposes and if disabled for some reason, the content or the functionality of the web page can be limited or unavailable.

Friday, March 14, 2025

bpTT: Seismic acquisition of Manakin-Cocuina field complete

by

Ryan Bachoo
143 days ago
20241021

bpTT pres­i­dent David Camp­bell says the seis­mic ac­qui­si­tion for the Man­akin-Cocuina field was com­plet­ed, and the da­ta col­lect­ed is now at the pro­cess­ing stage.

This up­date was pro­vid­ed by bpTT when the or­gan­i­sa­tion be­tween Min­is­ter of En­er­gy and En­er­gy In­dus­tries, Stu­art Young. Camp­bell al­so pro­vid­ed an up­date on bpTT’s joint ven­ture, deep wa­ter projects and the di­vest­ment of its ma­ture as­sets to Peren­co.

With re­spect to drilling op­er­a­tions, it was re­port­ed to the en­er­gy min­is­ter that drilling at the Cypre de­vel­op­ment con­tin­ues and fur­ther de­vel­op­ment drilling op­por­tu­ni­ties are be­ing eval­u­at­ed. This is in keep­ing with the en­er­gy min­is­ter’s call to get every mol­e­cule of oil and gas from the ground and bpTT’s com­mit­ment to ac­cel­er­ate gas pro­duc­tion.

With re­new­able en­er­gy al­so in bpTT’s lo­cal en­er­gy port­fo­lio, it was re­port­ed that the 92.2 megawatts (MW) so­lar project, ‘Project Lara’ con­tin­ues apace and is ex­pect­ed to be on­line by 2025.

At the meet­ing, Young em­pha­sized that stake­hold­er re­la­tion­ships are cru­cial in en­er­gy pro­duc­tion and that a more re­silient and re­spon­si­ble en­er­gy sec­tor is fos­tered through con­sis­tent­ly meet­ing and col­lab­o­rat­ing with en­er­gy sec­tor stake­hold­ers such as bpTT.

Instagram


Related articles

Sponsored

Weather

PORT OF SPAIN WEATHER

Sponsored